Friday, March 18, 2011
Sailing away
Tuesday, March 01, 2011
Out to sea. . .
Well, February was a long month but I didn't do much in the way of sewing. I made a couple of these blocks, mended a pair of jeans, hemmed some pants. . . and picked up the TimeOut Socks for DH. I ripped out the heel and, with much counting, accurately turned the heel for a 72 stitch sock. I didn't really feel like knitting them but it was our anniversary so I've been slogging through them.
I had planned to start a Schnibbles quilt in Feb but I didn't get past the sorting the charm packs stage. Feb is always a tough month. So I wanted some NBK, er NBQ (no brain quilting) and pulled out this jelly roll. I'm planning to do a rail fence on either side of the panel. The picture shows the panel folded in half because my design wall is very small! I like it so far. It's Nautical and Nice fabric by Sandy Gervais.
Subscribe to:
Posts (Atom)
Shop hop blocks
These are the blocks that I have completed so far from the shop hop. The blocks came with maroon reds and forest greens for the accent colo...
-
Fabric Used this Week: 0 yards Fabric Used year to Date: 8.5 yards Fabric Added this Week: 14 yards Fabric Added Year to ...
-
I ordered this Tardis panel from Spoonflower to make a quick quilt for my dad for Father's Day. This is my dad's last father'...
-
I'm still feeling poorly so my sewing has dropped off the cliff in terms of productivity. I decided I need another fabric for my Ghos...